Surveys are required to help us understand more about the conditions of the planned access route to the Longfield Solar Farm site. We are aiming to carry out these surveys over a period of two weeks, with work currently planned to start from 17 February 2025.
To carry out these works safely, some parts of the road network need to be temporarily closed to through traffic during working hours (8am and 5pm) on the following dates:
- 17 February 2025: Closure of Wheelers Hill and Cranham Road (Permit numbers: EP02231012402 01 and EP02231012403 01).
Access will be maintained for residents, emergency service vehicles and pedestrians at all times during this period. Roads will be reopened outside of working hours.
An interactive map showing the location of the planned closures and alternative routing can be viewed at https://one.network/public using the permit numbers above. Temporary road signage will be in place during each closure.
All activity on-site is being carried out in line with the requirements of the development consent for Longfield. This includes agreeing the details of the activities with your local councils and notifying emergency services prior to starting on-site.